Scroll Top
6100 W. Erie St Chandler, AZ 85226

Work

OUR PROJECTS

1

Below we’ve included information on a few representative projects to help convey to you the versatility and wide-ranging experience of Team Hawk. Come back to this section of our website regularly as it is constantly being updated with our new successfully-completed projects. Please give us a call so we can discuss adding your project to the list.

Exterior of a building mock up
Northern AZ Univ - Student Academic Services Building
Exterior of parking garage
DOWNTOWN PHOENIX HOUSING - ROOSEVELT POINT APARTMENTS
Far view of picnic tables and shade cover at a park
DUST DEVIL PARK
Luka Air Force Base Entrance aSign
LUKE AFB DESIGN/BUILD ELECTRICAL IDIQ TASK ORDERS
Exterior of Toyota car dealership
RIVERVIEW TOYOTA
Exterior of building with big windows
INFUSIONSOFT
Exterior of building in the desert
GILA RIVER HEADSTART FACILITY
An airplane outside a building that is under construction
AMARG - DAVIS MONTHAN AEROSPACE MAINTENANCE AND REGENERATION GROUP HIGH BAY HANGAR
Birdseye view of a facility in the desert
WELTON BORDER CROSSING STATION
Outdoor tables and chairs under string lights
VISTA DEL SOL - ARIZONA STATE UNIVERSITY CAMPUS HOUSING
Interior of Spouts Grocery Store
SPROUTS - PRESCOTT VALLEY
Exterior of the Bell Lexus car dealership
BELL LEXUS
Exterior of courthouse with glass windows
JOHN M. ROLL US FEDERAL COURTHOUSE
Exterior of a church
CENTRAL CHRISTIAN CHURCH
Exterior of Phoenix Airport
SKY HARBOR TERMINAL 3 PARKING GARAGE LED LIGHTING UPGRADE
Exterior of Phoenix Airport
SKY HARBOR TERMINAL 3 PARKING GARAGE LED LIGHTING UPGRADE
Luka Air Force Base Entrance aSign
LUKE AFB DESIGN/BUILD ELECTRICAL IDIQ TASK ORDERS
An airplane outside a building that is under construction
AMARG - DAVIS MONTHAN AEROSPACE MAINTENANCE AND REGENERATION GROUP HIGH BAY HANGAR
Exterior of Toyota car dealership
RIVERVIEW TOYOTA
Exterior of the Bell Lexus car dealership
BELL LEXUS
Exterior of a church
CENTRAL CHRISTIAN CHURCH
Far view of picnic tables and shade cover at a park
DUST DEVIL PARK
Exterior of a building mock up
Northern AZ Univ - Student Academic Services Building
Exterior of parking garage
DOWNTOWN PHOENIX HOUSING - ROOSEVELT POINT APARTMENTS
Outdoor tables and chairs under string lights
VISTA DEL SOL - ARIZONA STATE UNIVERSITY CAMPUS HOUSING
Exterior of building in the desert
GILA RIVER HEADSTART FACILITY
Exterior of Phoenix Airport
SKY HARBOR TERMINAL 3 PARKING GARAGE LED LIGHTING UPGRADE
Luka Air Force Base Entrance aSign
LUKE AFB DESIGN/BUILD ELECTRICAL IDIQ TASK ORDERS
Birdseye view of a facility in the desert
WELTON BORDER CROSSING STATION
An airplane outside a building that is under construction
AMARG - DAVIS MONTHAN AEROSPACE MAINTENANCE AND REGENERATION GROUP HIGH BAY HANGAR
Exterior of courthouse with glass windows
JOHN M. ROLL US FEDERAL COURTHOUSE
Far view of picnic tables and shade cover at a park
DUST DEVIL PARK
Exterior of Phoenix Airport
SKY HARBOR TERMINAL 3 PARKING GARAGE LED LIGHTING UPGRADE
Luka Air Force Base Entrance aSign
LUKE AFB DESIGN/BUILD ELECTRICAL IDIQ TASK ORDERS
Luka Air Force Base Entrance aSign
LUKE AFB DESIGN/BUILD ELECTRICAL IDIQ TASK ORDERS
An airplane outside a building that is under construction
AMARG - DAVIS MONTHAN AEROSPACE MAINTENANCE AND REGENERATION GROUP HIGH BAY HANGAR
Exterior of building with big windows
INFUSIONSOFT
Exterior of parking garage
DOWNTOWN PHOENIX HOUSING - ROOSEVELT POINT APARTMENTS
Exterior of Toyota car dealership
RIVERVIEW TOYOTA
Exterior of building with big windows
INFUSIONSOFT
Interior of Spouts Grocery Store
SPROUTS - PRESCOTT VALLEY
Exterior of building in the desert
GILA RIVER HEADSTART FACILITY
LOOKING FOR A QUALITY AND AFFORDABLE CONSTRUCTOR FOR YOUR NEXT PROJECT?

NORTHERN AZ UNIV - STUDENT ACADEMIC SERVICES BUILDING

Project Details

  • Start: Aug, 2014
  • Completion: Est – Sep, 2015
  • General Contractor: Hardison Downey
  • Electrical Contract Value: $2.1MM
  • Delivery Method: Design/Bid/Build

Project Description

Construction of a new 93,378 sq. ft. Student Academic Services Building on the campus of Northern Arizona University. The four-level building will house Admissions, Office of the Registrar, Financial Aid, Student Accounts, Lumberjack Mathematics Center, faculty offices and a 154-seat auditorium for student events.

RIVERVIEW TOYOTA

Project Details

  • Start: Jan, 2010
  • Completion: Aug, 2010
  • General Contractor: Sahara
  • Electrical Contract Value: $750K
  • Delivery Method: Design/Bid/Build

Project Description

With over 30 car dealerships on its resume, Hawkeye is proud of the Riverview Toyota Dealership as yet one more example of the company’s ability to successfully design, plan, and execute this complex type of development. Completed in just 8 months, Hawkeye’s planning and scheduling helped bring this project in one month ahead of schedule.

WELTON BORDER CROSSING STATION

Project Details

  • Start: Jun, 2010
  • Completion: Jan, 2012
  • General Contractor: Okland Construction
  • Electrical Contract Value: $4.4MM
  • Delivery Method: Design/Build

Project Description

New border patrol station in Wellton, AZ to support 375 agents. Facility includes multiple buildings on a single site. The primary building is the station building, including offices, quiet room, training, detention, and exercise/locker room area. The second building is a maintenance facility for vehicles and electronic gear. Other buildings on the site are essentially canopies that shelter a vehicle fueling operation and a vehicle clean and wash operation.

JOHN M. ROLL US FEDERAL COURTHOUSE

Project Details

  • Start: Jul, 2011
  • Completion: Apr, 2013
  • General Contractor: Sundt Construction
  • Electrical Contract Value: $3.1MM
  • Delivery Method: Design/Build

Project Description

2-Story 57,000 s.f. building. Includes judges’ chambers, detention cells, and administrative areas for the federal courts and the U.S. Marshals Service, as well as two courtrooms, one for Bankruptcy Courts, and the other for District Courts. Hawkeye’s scope included electrical, fire alarm, emergency power systems, photovoltaic system, and a complete special systems infrastructure including security, communications, controls, and audio/video.

DOWNTOWN PHOENIX HOUSING - ROOSEVELT POINT APARTMENTS

Project Details

  • Start: Apr, 2012
  • Completion: Sep, 2013
  • General Contractor: Hardison Downey
  • Electrical Contract Cost: $3.2MM

Project Description

New urban-design, mixed-use development including 609 beds within 326 units in a variety of studio, one-, two-, three- and four-bedroom apartments on a 4.83-acre site. Amenities in the two (2) cast-in-place and post tension towers (an eight-story and seven-story) include two (2) clubhouses totaling 7,000 SF, tanning and fitness facilities, WiFi and Internet access, swimming pools, study lounges, computer labs and a 159,400 SF five-story parking garage with more than 400 spaces. One of the residential buildings offers 7,500 SF of retail space at the street level. The project was designed to appeal to older students and young professionals affiliated with Arizona State University’s downtown campus, University of Arizona’s College of Medicine and the Phoenix Biomedical Campus.

INFUSIONSOFT

Project Details

  • Start: Aug, 2012
  • Completion: Dec, 2012
  • General Contractor: Willmeng Construction, Inc.
  • Electrical Contract Value: $851K
  • Delivery Method: Design/Bid/Build

Project Description

The new state-of-the-art corporate headquarters building for Infusionsoft includes employee amenities such as a library, game room, football field/sports court, lactation room, quiet rooms, and an outdoor patio/grill area. Open architecture invites close collaboration and serves to inspire the Infusionsoft team to work together with flexible open huddle areas. Idea paint allows employees to write directly on walls throughout the building, eliminating the need for white boards. Exposed industrial finishes and bare material were used as a design aspect to give this contemporary space a chic industrial feel. The building also boasts a large training room, recording studio, and auditorium. The 250-person auditorium will become the training center for small businesses in Arizona to get the tools and education to help power their success.

VISTA DEL SOL - ARIZONA STATE UNIVERSITY CAMPUS HOUSING

Project Details

  • Start: Feb, 2007
  • Completion: Jan, 2008
  • General Contractor: Hardison Downey
  • Electrical Contract Value: $4.87MM
  • Delivery Method: Design/Bid/Build

Project Description

Vista del Sol provides a unique on-campus living experience for 1,866 students in the South Neighborhood. The community features private or shared accommodations in furnished apartment-style units. At the center of the 10-building community is a 23,000 sq. ft. community center featuring a club-style fitness center, social lounge, game room and movie theater. Adjoining the community center is a resort-style swimming pool with a large sundeck, outdoor lounge areas, basketball and sand volleyball courts.

CENTRAL CHRISTIAN CHURCH

Project Details

  • Start: Jun, 2006
  • Completion: Feb, 2007
  • General Contractor: MTV Construction
  • Electrical Contract Value: $2.76MM
  • Delivery Method: Design/Bid/Build

Project Description

Worship Center to seat 1,200, 2 Buildings to serve kids from birth through 6th grade, a student building for 7th grade through 12th grade, a prayer garden, Central Café, Central Bookstore, splash pad, and extensive courtyards and common areas. Property size: 155 acres, of which only 30 are developed.

DUST DEVIL PARK

Project Details

  • Start: 2009
  • Completion: 2009
  • General Contrator: City of Phoenix
  • Electrical Contract Value: $400K
  • Delivery Method: Design/Bid/Build

Project Description

The 15-acre park boasts a skate park, a splash pad, a lighted basketball court, walking and exercise paths, a playground with separate play areas for younger and older kids, open grassy areas, a restroom, security lighting, more than 300 trees and solar-paneled picnic ramadas. Electricity generated by the solar panels helps to offset the park’s electricity costs. The park cost $5million and was funded with proceeds from the Parks and Preserve Initiative

GILA RIVER HEADSTART FACILITY

Project Details

  • Start: Oct, 2012
  • Completion: Oct, 2013
  • General Contractor: Rock Gap Engineering
  • Delivery Method: CM@Risk

Project Description

40,000 s.f. masonry and steel building including 8 classrooms, multi-purpose room, and administrative and ancillary spaces. Electrical scope included solar site lighting and LED lighting of parking canopies. Hawkeye’s involvement in this project started during preconstruction with budget estimating and value engineering services.

SPROUTS - PRESCOTT VALLEY

Project Details

  • Start: Dec, 2013
  • Completion: Jun, 2014
  • General Contractor: Campbell Development
  • Electrical Contract Value: $300K
  • Delivery Method: Design/Bid/Build

Project Description

The Prescott Valley Sprouts is Hawkeye’s 3rd Sprouts facility completed in Arizona. Hawkeye’s scope included all electrical and fire alarm, coordinating with the Owner and developer to receive & install the Owner-furnished lighting fixture package. Like the other Sprouts projects, the Prescott Valley Sprouts was completed on time and within budget.

SKY HARBOR TERMINAL 3 PARKING GARAGE LED LIGHTING UPGRADE

Project Details

  • Start: Oct, 2012
  • Completion: Aug, 2013
  • General Contractor: Sun Eagle Construction
  • Electrical Contract Value: $1.9MM
  • Delivery Method: CM@Risk

Project Description

Upgrade parking garage lighting from fluorescent to LED. Work included removal & replacement of fixtures (1,363 fixtures in garage plus other fixtures in lobby, stairwells, etc.), installation of new electrical system backbone (new service entrance section and panelboards), elevator lobby lighting, stairwell lighting, and new LED pole lights on the top levels.

LUKE AFB DESIGN/BUILD ELECTRICAL IDIQ TASK ORDERS

Project Details

  • Start: Oct, 2012
  • Completion: Ongoing
  • General Contractor: FMCI/RGE Joint Venture Partnership
  • Electrical Contract Value: Multiple Task Orders from $5K to $3MM
  • Delivery Method: IDIQ

Project Description

Sole source supplier of design/build electrical services in support of $50MM IDIQ Contract for Electrical design/build services. In this role, Hawkeye has represented the general contractor interfacing directly with federal contracting officers to determine scope, create schematic designs, and prepare coefficient-modified Means-based estimates for use by the USAF as documentation supporting the issuance of Design/Build Electrical Task Orders.

AMARG - DAVIS MONTHAN AEROSPACE MAINTENANCE AND REGENERATION GROUP HIGH BAY HANGAR

Project Details

  • Start: Nov, 2011
  • Completion: Jun, 2014
  • General Contractor: Okland Construction
  • Electrical Contract Value: $3.3MM
  • Delivery Method: Design/Build

Project Description

Design/Build Hangar facility at Davis Monthan. Prevalent electrical aspects of the project completed by Hawkeye include: Primary and secondary distribution power, emergency backup generator power, uninterruptible power supplies, automated interior lighting systems, and connection to the base’s EMCS system.

BELL LEXUS

Project Details

  • Start: Dec, 2012
  • Completion: Dec, 2013
  • General Contractor: Johnson Carlier
  • Electrical Contract Value: $1.6 MM
  • Delivery Method: Design/Bid/Build

Project Description

Bell Lexus North Scottsdale is a new 102,895 SF full service automotive dealership. Includes a state of the art two story service department with 59 service bays and display parking deck on upper floor, with full-service car wash, detail bays, and fueling station. The project is LEED Certified with maximized energy efficiency.